All References

PLANNING, MACRO AND MICRO SIMULATIONS AND TRAFFIC ANIMATIONS

 

ABROAD

01/2014 – 06/2014 

Transport demand modelling for ADRIAMOS Project, link Venice - Igoumenitsa (VISUM).
Customer: Systema d.o.o. – Transport Planning Consultants, Athens
Location: Western Balkans
______________________________________

11/2013 – 12/2014 

Transport demand modelling for the Regional Balkan Infrastructure Study “REBIS” II (VISUM)
Customer: Systema d.o.o. – Transport Planning Consultants, Athens
Location: Western Balkans
______________________________________

4/2010 – 06/2010

Traffic Flow Study for the observed area around the International Airport Road from km 22 +181.00 to km 25+383.00 in the City of Tripoli (VISUM and VISSIM).  
Customer: Meridianproject, Tripoli
Location: Tripoli, Libya
______________________________________

07/2009 – 08/2009 

Traffic Flow Analysis in Luanda, Angola, by using the VISUM software. 
Customer: Vlatacom, Zemun
Location: Luanda, Angola
______________________________________

 

SERBIA 

05/2022 – 06/2022

Analiza saobraćajnih tokova na osnovu makro (VISUM) i mikro (VISSIM) simulacije za potrebe kontrole funkcionisanja saobraćajnice SAO 6 u planiranom stanju u zoni “Beograda na vodi”.
Customer: PTC – Public Transport Consult L.t.d, Belgrade
Location: Belgrade, Serbia
______________________________________

01/2022 – 03/2022

Traffic flow analysis on the macro (VISUM) and micro (VISSIM) level for the purpose of making amendments and supplements to the Detailed Regulation Plan in New Belgrade.
Customer: Bureau Cube Partners, Belgrade
Location: Belgrade, Serbia
______________________________________

10/2021 – 01/2022

Traffic Flow Analysis on the macro (VISUM) and micro (VISSIM) level in the zone of trade and commercial facilities along Belgrade-Nis Highway, from Bubanj potok Loop to Transped Loop. 
Customer: IKEA Srbija L.t.d, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2021 – 11/2021

Justifiality Study of the access road to “Singidunum” Complex.
Customer: ZAP L.t.d, Belgrade
Location: Belgrade, Serbia
______________________________________

05/2021 – 09/2021

Impact Assessment Study of Belgrade Waterfront area on the adjacent traffic network through the creation of microsimulation models (VISUM and VISSIM) of different optional solutions.
Customer: City Net – Scientific Research Center, Belgrade
Location: Belgrade, Serbia
______________________________________

2/2020-03/2021

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for the zone surrounding a portion of the anticipated complex Skyline.
Customer: Bureau Cube Partners, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2020 – 03/2021 

Traffic Flow Analysis based on macro (VISUM) and micro (VISSIM) simulations for Block 32 and the impact of Block 32 on the adjacent traffic network.
Customer: ZAP d.o.o, Belgrade
Location: Belgrade, Serbia
______________________________________

10/2019 – 01/2020 

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for the zone surrounding a portion of the anticipated complex Belgrade Waterfront.
Customer: Bureau Cube Partners, Belgrade
Location: Belgrade, Serbia
______________________________________

02/2019 – 09/2019

Traffic Analysis with the use of macro (VISUM) and micro (VISSIM) simulations of traffic flows at the shipyard site in Novi Sad
Customer: Via Inzenjering, Novi Sad
Location: Novi Sad, Serbia
______________________________________

5/2018 – 07/2018 

Impact assessment of Corridor X on the economic and social development of Serbia and the municipalities situated in its zone (VISUM).  
Customer: "Koridori Srbije", Belgrade
Location: Serbia
______________________________________

08/2016 – 03/2017 

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for the new shopping mall in Mis Irbijeva Street and its impact on the adjacent traffic network.
Customer: PC Art, Belgrade
Location: Belgrade, Serbia
______________________________________

07/2016 – 11/2016 

Traffic Flow Analysis for the Detailed Regulation Plan for the block situated among Kneza Miloša, Sarajevska, Durmitorska and Drinska streets, with the use of macro (VISUM) and micro (VISSIM) simulations of traffic flows; Creation of the Preliminary Traffic Design for the entry/exit to/from the planned facility and the analysis of pedestrian flows.
Customer: City Planners, Belgrade
Location: Belgrade, Serbia
______________________________________

06/2016 – 08/2017 

Preliminary Traffic Designs for the purpose of creation of the Detailed Regulation Plans PDR K1 and PDR K2 in the zone of the business and industrial park along the highway bypass Batajnica - Dobanovci, location: Singidunum
Customer: ZAP, Belgrade
Location: Belgrade, Serbia
______________________________________

06/2016 – 08/2016 

Traffic Analysis of the Master Plan of the Singidunum Complex and Detailed Regulation Plans PDR K1 and PDR K5 in the zone of the business and industrial park along the highway bypass Batajnica - Dobanovci (VISUM)
Customer: ZAP, Belgrade
Location: Belgrade, Serbia
______________________________________

11/2015 – 03/2016

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for the commercial zone in Belgrade (IKEA Belgrade West)
Customer: IKEA Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

11/2015 – 01/2016 

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for a public underground garage in Kneza Milosa Street and its impact on the adjacent traffic network. 
Customer: PC Art, Belgrade
Location: Belgrade, Serbia
______________________________________

06/2015 – 07/2015 

Impact Assessment Analysis of public underground garages: Studentski trg, Kosovska Street and National Library on the local traffic network.
Customer: PC Art, Belgrade
Location: Belgrade, Serbia
______________________________________

12/2014 – 06/2015 

Traffic Flow Analysis of the Highway E-80 from the administrative crossing Merdare (with Kosovo) to Doljevac via Kursumlija, Prokuplje bypass, Zitoradja for the purpose of creation of the Master Design and the Pre-Feasibility Study (VISUM)
Customer: T-Mode, Belgrade
Location: Serbia
______________________________________

08/2014 

Additional Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels in commercial and industrial areas along Belgrade-Nis Highway, south of toll gates Bubanj potok (IKEA East).
Customer: IKEA Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

08/2013 – 10/2013 

Traffic Study required for the Detailed Regulatory Plan of the block situated among Kneza Milosa, Drinska, Sarajevska and Durmitorska streets.
Customer: Orchid Group, Belgrade
Location: Belgrade, Serbia
______________________________________

04/2013 – 05/2013 

Socio-economic evaluation of the concept stipulated by the Metro System Master Plan – additional analysis of transport indicators (VISUM) in Belgrade.
Customer: Belgrade Land Development Public Agency
Location: Belgrade, Serbia
______________________________________

01/2013 – 05/2013 

IKEA Belgrade, West Store – Traffic Flow Analysis with the use of micro (VISSIM) traffic simulations.
Customer: IKEA Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

11/2012 -12/2012 

Traffic Flow Analysis on macro (VISUM) and micro (VISSIM) levels for the zone around the Beko Complex in Belgrade.
Customer: ZAP, Belgrade
Location: Belgrade, Serbia
______________________________________

08/2012 – 10/2012 

Micro simulation (VISSIM) for the three options of traffic operations at Autokomanda and animation of the most favourable option.
Customer: CEP, Belgrade
Location: Belgrade, Serbia
______________________________________

07/2012 – 11/2012 

Traffic Flow Analysis in the commercial and industrial area along Belgrade – Nis Highway, south of the toll booth Bubanj potok, by using macro (VISUM) and micro (VISSIM) traffic flow simulations.
Customer: PC Art, Belgrade
Location: Belgrade, Serbia
______________________________________

07/2012 – 08/2012 

Traffic Flow Analysis for the purpose of creation of the Detailed Regulation Plan for the block situated among Kneza Milosa, Sarajevska, Durmitorska and Drinska streets, with the use of macro (VISUM) simulations of traffic flows.
Customer: Autel Infosistem, Belgrade
Location: Belgrade, Serbia
______________________________________

03/2012 – 05/2012 

Analysis of traffic and transportation solutions for the Inner Ring Road connections in Novi Beograd with the use of macro (VISUM) and micro (VISSIM) simulations of traffic flows.
Customer: "Hidroprojekt saobraćaja", Belgrade
Location: Belgrade, Serbia 
______________________________________

11/2011 – 12/2011 

Traffic Flow Analysis in the gravitating zone of the new bridge across the Ada Ciganlija peak in the temporary transport mode upon opening of the bridge for motor vehicle traffic.
Customer: Branch Office POOR Bau GmbH, Belgrade
Location: Belgrade, Serbia
______________________________________

07/2010 – 08/2010 

Traffic Analysis of the existing and future traffic conditions on the part of the highway that goes through Belgrade (from Omladinskih Brigada Street to Vojislava Ilica Street) both on the macro level (VISUM) and on the micro level (VISSIM), and its impact on the adjacent traffic network.
Customer: CPV, Novi Sad
Location: Belgrade, Serbia
______________________________________

04/2010 – 05/2010

Multicriteria Traffic Analysis of optional conceptual solutions of the Radnicka loop
Customer: Belgrade Land Development Public Agency
Location: Belgrade, Serbia
______________________________________

1/2009 - 12/2009 

Traffic Study with the analysis of optional solutions for accessing the Yugoslavia Hotel, both on the macro level (VISUM) and the micro level (VISSIM), and its impact on the adjacent traffic network.
Customer: Alpe Adria Hotel, Belgrade
Location: Belgrade, Serbia
______________________________________

08/2008 – 02/2009 

Analysis of mutual relations between the urban transport system and development of Ada Huja area
Customer: Belgrade Land Development Public Agency
Location: Belgrade, Serbia
______________________________________

12/2008 – 01/2009 

Micro Traffic Analysis of optional solutions for having access to the Marina Dorcol for the purpose of creation of the Detailed Regulation Plan for the area between Francuska and Tadeusa Koscuska streets and the existing railroad in Dorcol (Analysis - VISUM, simulation and valuation – VISSUM).
Customer: Urban Planning Institute of Belgrade
Location: Belgrade, Serbia
______________________________________
 
05/2008 – 06/2008 

Simulation of traffic flows at the roundabout Omladinski stadion in VISSIM
Customer: Putinvest, Belgrade
Location: Belgrade, Serbia
______________________________________

03/2007 – 03/2008 

Transport Master Plan of Belgrade (Smartplan)
Customer: Belgrade Land Development Public Agency
Location: Belgrade, Serbia
______________________________________

11/2007 – 01/2008 

Traffic Study reviewing traffic routes at Belgrade fortress (study and analysis of movements of visitors made in VISUM).
Customer: Belgrade City Institute for the Protection of Cultural Monuments 
Location: Belgrade, Serbia
______________________________________

11/2007 -12/2007 

Traffic Analysis of options in VISUM during the reconstruction of the Gazela Bridge
Client: ALPE Saobraćaj, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2007 – 10/2007 

The simulation of traffic flows in the zone of the Slavija Roundabout in VISSIM.
Customer: Belgrade Land Development Public Agency 
Location: Belgrade, Serbia
______________________________________

06/2007- 09/2007 

Traffic Study in which the connection between Bircaninova Street and Kneginje Zorke Street is reviewed (the analysis in VISSUM and the simulation in VISSIM).
Customer: Belgrade Land Development Public Agency 
Location: Belgrade, Serbia
______________________________________


TRAFFIC INFRASTRUCTURE DESIGNS, STUDIES AND ANALYSES 

 

ABROAD

02/2013 – 08/2013 | 01/2010 – 08/2010 

Traffic Signage Preliminary Design and the Traffic Signage Master Design for the improvement, upgrading and fitting out of the Coastal Road for a part of Sector III, Sector IV, a part of Sector V and a part of Sector VIII (805 km in total) in Libya
Customer: Meridianprojekt, Tripoli
Location: Libya
______________________________________

 

SERBIA 

07/2022

Traffic and Traffic Signalling Design during the course of changed traffic regime due to the sport event “Valjevo Rally”.
Customer: ASK “Racing team Avako”, Belgrade
Location: Valjevo, Serbia
______________________________________

07/2022

Traffic and Traffic Signalling Design during sport race “The 55th Serbia Rally” in a portion of municipal and state roads.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Brus and Vrnjacka banja, Serbia
______________________________________

06/2022

Traffic and Traffic Signalling Design during the sport event “Rally Mionica” in a portion of municipal and state roads.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Serbia
______________________________________

05/2022

Traffic and Traffic Signalling Design during the sport event “Tara 2022”.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Serbia
______________________________________

02/2022 – 04/2022

Traffic and Traffic Signalling Design during the Cross-Country race “BAJA SERBIA” held on a portion of municipal and state roads.
Customer: Sports Car Association “Rallysports, Pozarevac
Location: Serbia
______________________________________

11/2021 – 12/2021

Study of Public Parking Spaces: Skerliceva Street – the National Library and the Marketplace in Banovo brdo.
Customer: Ballast Nedam L.t.d, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2021

Traffic and Traffic Signalling Design during sport race “The 54th Serbia Rally” in a portion of municipal and state roads.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Brus and Vrnjacka banja, Serbia
______________________________________

07/2021

Traffic and Traffic Signalling Design during the sport event “Rally Mionica” in a portion of municipal and state roads.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Serbia
______________________________________

06/2021

Technical control of the Traffic and Traffic Signalling Design, temporary traffic signalling during the execution of works on the relocation of telecommunication installations in the state road of the IIB class no. 355, from km 23+114.00 do 23+635.00. 
Customer: “D.C. Energocoop”, Belgrade
Location: Serbia
______________________________________

05/2021

Traffic and Traffic Signalling Design during the course of changed traffic regime due to the sport event “Valjevo Rally”.
Customer: Sports Car and Carting Association of Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

04/2021 – 09/2022 

Correction of drawings in AutoCAD for 56 EKO pumps in Serbia. 
Customer: EKO Serbia, Belgrade
Location: Serbia  
______________________________________

05/2020 – 7/2022

Preliminary Design, Design for the Issuance of the Building Permit, Elaboration of the Detailed Design of traffic signage for the connection of the anticipated business complex (Hall in Surcin) to the existing and planned road, as well as within the complex. 
Customer: BG Real Consulting, Belgrade
Location: Belgrade, Serbia
______________________________________

9/2020 

Traffic Frequency Analysis at the intersection of Partizanske avijacije, Bulevar Mihajla Pupina, Tosin bunar and Jurija Gagarina streets in Novi Beograd
Customer: EKO Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2020 

Control counts at the intersection of Marija Bursać Street in Zemun.
Customer: EKO Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

07/2020 

Traffic Frequency Analysis at the intersection of Marija Bursać Street in Zemun.
Customer: EKO Serbia, Belgrade
Location: Belgrade, Serbia
______________________________________

06/2020 

Traffic Signage Project during the change of the traffic regime due to event titled "Pancevo Autoslalom" in the 7. nova Street in Pancevo.
Customer: Fanatik Auto-Moto Sports Association, Pancevo
Location: Pancevo, Serbia
______________________________________

07/2019 

Technical control of the traffic and traffic signage, placement of the protective fence on the divisional island on the northern tangent, from the Mihajlo Pupin Bridge to the intersection with Zrenjanin Road
Customer: JKP „Beograd put”, Belgrade
Location: Belgrade, Serbia
______________________________________

04/2019 – 05/2019 

Traffic Signage Project, which is a part of the Elaboration of the Detailed Design for the new construction of the facility on the State Road, class IIA, no. 157, a section from Raca to Cerovac at km 18+325.53. 
Customer: TM Inženjering, Belgrade
Location: Kragujevac, Serbia 
______________________________________

01/2018 

Technical control of the project dealing with the connection of Nova 2 Street to the state road, class IIB, no. 319, on the right site, at the chainage km 18+944.00.
Customer: Model 5, Belgrade
Location: Kragujevac, Serbia 
______________________________________

12/2017 - 02/2018 

Feasibility Study for the construction of the connection of a business facility to the state road, class IIA, no. 157, Raca - Cerovac. 
Customer: ARP, Belgrade
Location: Kragujevac, Serbia  
______________________________________

07/2017 

Feasibility Study for connection of the new road to the state road, class IIB, no. 319.  
Customer: Traffic Safety Systems, Belgrade
Location: Belgrade, Serbia
______________________________________

04/2017 

Technical control of the Master Design of the traffic signage to mark the organization Konkav-Konveks on the state road, class IIB, no. 319.
Customer: Konkav-Konveks, Belgrade
Location: Belgrade, Serbia
______________________________________

12/2016 

Technical control of the Master Design for the temporary traffic signage at the intersection of the state road, class IB, no. 10 in Pancevo. 
Customer: Belgrade Water Supply and Sewerage Public Company
Location: Pancevo, Serbia
______________________________________

10/2016 

Technical control of the Traffic and Traffic Signage Design during the construction of the drop telecommunications optic cable Belgrade-Altina. 
Customer: KBV Datacom, Belgrade
Location: Belgrade, Serbia
______________________________________

09/2016 

Technical control of the Traffic and Traffic Signage Design during the construction of the drop telecommunications optic cable at Beska
Customer: KBV Datacom, Belgrade
Location: Beska, Serbia 
______________________________________

08/2016 

Technical control of the Traffic and Traffic Signage Design during the construction of the drop telecommunications optic cable in Krnjesevci, Dobanovci 2 and in Simanovci.
Customer: KBV Datacom, Belgrade
Location: Beska, Serbia 
______________________________________

08/2016 

Technical control of the Traffic and Traffic Signage Design during the construction of the discharge pipeline in Topola.
Customer: Municipality of Topola
Location: Topola, Serbia
______________________________________

05/2016 

Technical control of the Temporary Traffic Signage Design during the construction of STS Limont and the connection of the cable line in the Cadastral Municipality of Pecinci
Customer: Limont Bosske Company l.t.d., Pecinci
Location: Pecinci, Serbia
______________________________________

03/2016 

Technical control of the Traffic Signage Master Design for the placement of a LED display and a portal in Citluk, Gornji Stepos and Veliki Kupci.
Customer: KBV Datacom, Belgrade
Location: Krusevac, Serbia 
______________________________________

08/2015 

Technical control of the Traffic Signage Master Design for the placement of traffic lights at the crossroads in the City of Krusevac.
Customer: KBV Datacom, Belgrade
Location: Krusevac, Serbia 
______________________________________

08/2015 

Technical control of the Elaboration of the Detailed Design of Traffic Signage from Preljina to Mrcajevci.
Customer: KBV Datacom, Belgrade
Location: Preljina – Mrcajevci, Serbia 
______________________________________

02/2015 – 04/2015 

Creation of Preliminary Designs for the Transped Loop – Justifiability Study. 
Customer: ARP, Beograd
Location: Belgrade, Serbia
______________________________________

09/2014 

Traffic Signage Design during the execution of works on the gasification of the distribution gas pipeline GMRS Kovačica - Debeljača - Opovo
Customer: SAPUTNIK M, Sombor
Location: Vojvodina, Serbia 
______________________________________

05/2012 – 07/2012

Social and Economic Evaluation of the concept stipulated by the Metro System Master Plan in Belgrade
Customer: Belgrade Land Development Public Agency
Location: Belgrade, Serbia
______________________________________

03/2009 – 05/2009

Preliminary Design and Master Design of construction works and traffic information signs for the purpose of rehabilitation, reconstruction, modernization and construction of cyclist paths in the territory of Novi Beograd.  
Customer: Belgrade Land Development Public Agency
Location: Novi Beograd, Serbia
______________________________________

2008 

Creation of the Design for the linear coordination of traffic lights in the stretch from Omladinska Street to Slanuška Street in Uzice
Customer: Construction Directorate, a Public Company, Užice
Location: Uzice, Serbia 
______________________________________

2008 

Creation of the Design dealing with the revision of functioning of traffic lights at the intersection of Dimitrija Tucovica Street – Dositejeva Street and Kneza Lazara Street – Omladinska Street in Uzice
Customer: Construction Directorate, a Public Company, Užice
Location: Uzice, Serbia 
______________________________________

10/2006 – 01/2007 

Master Construction Design for the connection of the facility Terazije terrasse – Facility B2 to Kraljice Natalije Street. 
Customer: "Mali kolektiv – ETB", Belgrade
Location: Belgrade, Serbia
______________________________________

07/2006 – 12/2006 

Study of Development and Implementation of Cycle Paths in Novi Beograd – Phase II (blocks leading to Zemun).
Customer: Belgrade Land Development Public Agency
Location: Novi Beograd, Serbia
______________________________________

11/2005 – 01/2006 

Preliminary Design with the analysis of the optimum solution for the connection of the newly designed facility Terazije terrasse – Facility B2 to the already existing street, together with the proposal for changing the traffic regime in Kraljice Natalije Street. 
Customer: "Mali kolektiv – ETB", Belgrade
Location: Belgrade, Serbia
______________________________________

 

GIS

Databases for the area Mirjevsko brdo - Rospi Cuprija
______________________________________

Databases for the area between the highway Belgrade - Obrenovac and the lake on Ada Ciganlija - Makis
______________________________________

Databases for the area between the highway Belgrade - Nis, Bulevar oslobođenja, Zvecanske, Bulevar Mira and Bul. vojvode Putnika, Prokop
______________________________________

Databases of UMP area III phase (Autokomanda - Trebinjska)
______________________________________

Databases and GIS implementations for Pastrovićeva Street
______________________________________

Database of cadastral parcels for Prokop
______________________________________

Database of cadastral parcels for Ada Ciganlija
______________________________________

Database of cadastral parcels for the UMP corridor, phase I and II
______________________________________
 

CONSTRUCTIONS

Preliminary construction project of UMP
______________________________________

Preliminary construction project of Pastrovićeva Street - UMP
______________________________________

Preliminary design of the Logistics Center building 
______________________________________
 

ENVIRONMENT

Cooperation on the Environmental Impact Assessment Study - Phase I of the first section of the UMP
______________________________________

Cooperation on the Study on Environmental Impact Assessment of the South Boulevard Road
______________________________________

Environmental Action Plan - Phase I of the first section of the UMP 
______________________________________

Environmental Impact Assessment - Phase I of the first section of the UMP